Inmr registration
Facilities are available for testing and validating smart technologies for industrial and commercial energy management including load control, smart metering, and AMI network-based demand response technology.Ħ50 m, 3-phase, 25 kV distribution line, 180 m 500 kV test line.Īpplied Materials, Mechanical Testing & Technology:Įxpertise in metals, polymers, ceramics, and composites to aid in testing and analysis for industry, government, insurance, litigation and research purposes. OpenADR compliance testing – Services include interconnection studies, operation planning and simulation and demand response. NERC CIP V5 assessment and remediation services for SCADA, RTU and protection devices. World’s first AeroMacs certification lab focused on base station and mobile station certification for the airline industry. Includes the only North American WiMax certification lab. Wired and Wireless communication technologies for electric and water utilities, WiMax, PLC, cellular, Microwave and Fiber communication system design and testing. Devices include smart home devices, connected streetlights, demand response and load control.Ĭritical Infrastructure Communication Lab: Indoor lab for AMI network design, smart device integration to AMI network. Pre-commissioning, inspection and validation of smart switch gear, reclosers, voltage regulators and capacitor bank controls. Multiple communication systems used to instrument all devices.
#INMR REGISTRATION FULL#
Low voltage up to 10 kA 1-phase, 5 kA 3-phase, and 10 kA DCĪn outdoor live 25 kV distribution system that includes a full-height pole yard, 2 MW / 600 MVA loadbank, reclosers, FCIs, switchgear and full SCADA.
High current tests specified to IEEE C37.60, C37.41, C37.30, C37.74, C37.20, 386, 837, 495 ASTM F81Īrc resistance tests on switchgear cubicles, explosion resistance tests on distribution transformers, power arc tests on insulators, capacitive current interruption tests (new line), arc flash, power equipment failure simulation. Kind of Power Source for the HP Laboratory:ĭirect 230 kV feed from major substation.ģ.7 kV to 39 kV, 3-phase up to 80 kA 3.7 kV to 45 kV, 1-phase up to 100 kA Total Number of Employees in the HP Laboratory: BC Ministry of Environment’s Environmental Data Quality Assurance Regulation (BC MOE EDQA).UL Third Party Test Data Program (TPTDP).Engineers and Geoscientists BC OQM Program.
#INMR REGISTRATION ISO#
#INMR REGISTRATION PORTABLE#
High current test thermal test mechanical test mobile testing, radio influence voltage (RIV) condition assessment.ĩ0 kV VFRTS and 800 kV portable 50/60 Hz resonant test set. Other Tests Performed on Insulators, Arresters, Bushings, Cable Terminations:
Tracking wheels spray wheel, dip wheel salt fog/ weathering chamber – IEC 61109, IEC TR 62730 and ASTM G53 (40 kV) Testing includes development, qualification, commissioning, and acceptance. High current load cycling is also available up to 3000 A.ġ00 m.
Portable variable frequency resonant test set, 90 kV, max. Total Number of Employees – the HV Laboratory:ġ5 m length x 6 m width x 2.5 m height Dielectric Testing FacilitiesĦ m length x 6 m width x 7 m height Transformer TestingĬable systems up to 500 kV, including lightning impulse and switching impulse, hipot, and PD measurements.